Glossary
Short explanations of the terms we use on this site. These are general explanations, not legal advice.
- Co-owner with a stake
- An owner who contributes land to a project and remains a co-owner up to the agreed value. Their share, deadlines and terms for returning the land are recorded in the contract at the notary.
- Feasibility study
- A calculation of how many units can be built on the land, what their projected value is and what the owner’s share is. With us it is free and without obligation; we close the deal only if it adds up.
- Projected sale price
- The expected market price of a unit at the time of agreement, at which the home the owner receives is valued. If prices rise the owner gains; if they fall the contractually guaranteed value applies.
- Settlement of the difference in value
- If the contributed land is worth more than the home the owner receives, the difference is transferred to a bank account at the conclusion of the deal, supported by a notary and lawyers.
- 4th construction stage and “turnkey”
- Construction stages describe the degree of completion. The 4th stage (partial turnkey) means a closed building with installations and plaster, without finishing works; “turnkey” (5th stage) means a finished, move-in-ready home. The agreement sets the stage.
- Designated use of land
- What is allowed on the land under the municipal spatial plan: building, agricultural, forest and other uses. The official record is the certificate of designated use issued by the municipality.
- Municipal spatial plan (OPN)
- The basic spatial act of a municipality, which sets the designated use of plots and the conditions for construction (setbacks, density, height). Many municipalities publish it in an online spatial information system.
- Buildable (building) land
- Land that the spatial plans define as building land, that is, intended for construction. Agricultural or forest land is generally not intended for construction.
- Utility infrastructure
- Access to a road, electricity, water and sewerage. It largely determines whether a project makes sense; providing missing infrastructure can be too expensive.
- Utility contribution
- A payment to the municipality for connecting a building to the utility infrastructure. Within the project it is part of the costs we take on.
- Subdivision (parcelling)
- The surveyed division of a larger plot into several smaller building plots. How many plots are possible is set by the spatial plans and the shape of the land.
- Parcel number and cadastral municipality
- The designation of a plot in the land cadastre, for example 512/3, and the cadastral municipality (k.o.) in which it lies. It identifies the land unambiguously.
- Land register
- The public record of ownership and encumbrances on real estate (mortgages, easements). Before deciding, check the ownership situation and encumbrances.
- Notarial deed
- A document drawn up by a notary with special evidential weight. With us it records the owner’s share, deadlines, guaranteed value and the return of the land if not carried out.